In briefShow moreShow lessMicrosoft published a commissioned Forrester Total Economic Impact study on 5 February.
- Microsoft published a commissioned Forrester Total Economic Impact study on 5 February.
- Its percentages represented a modelled composite scenario, not an observed result for every customer.
- Asana began rolling out more sorting, filtering and grouping on 26 February.
- Both developments support decisions when assumptions and views are documented.
Field service gains an economic assessment structure
Microsoft published a Forrester Consulting Total Economic Impact study of Dynamics 365 Field Service on 5 February. Microsoft commissioned the study, which built a composite scenario from customer interviews. The vendor post highlighted a modelled 346 percent return over three years. That figure is not a general forecast and should not become an expected benefit until an organization replaces its assumptions with local volumes, costs and effects.
The useful element for a service manager is the structure. Field productivity, administrative work, billing, customer retention and adoption costs can be placed in one model. Record current travel time, first-time fix, time to completed work order and billing delay. Investment and operational change can then be evaluated using local evidence.
Project members gain more flexible views
Asana announced on 26 February a gradual rollout of consistent sorting and filtering across My Tasks and projects. New options included “assigned to me,” up to ten sorts and filters, and grouping by assignee, due date, status or project. The vendor expected full rollout by mid-March and documented differences between list and board views.
For project managers, this was a real work-surface change rather than a new method. Saved views can focus each role, but they do not determine priority. A team still needs shared status values and due dates and must identify the view used for formal follow-up.
Shared discipline for models and views
Both an economic model and a task view select what becomes visible. Document filters, owners and update times. A field-service calculation should trace back to work orders and finance records. A project view should reveal which tasks its filters include or hide.
Test the approach in one service-improvement project. Use local service measures as outcome indicators and create role views for technician, coordinator and project manager. Review exceptions weekly. The February sources can then support project and field-service management without treating a vendor model or a flexible screen as a completed business result.
The steering group should receive both estimates and observed values. A model may assume fewer administrative minutes per work order, while the project view shows the tasks intended to create that change. After four weeks, compare the assumption with actual time and unresolved exceptions. Tasks hidden from one role view must remain visible to the project manager. This connects economic analysis, field work and project follow-up without allowing an aggregate percentage to obscure who is accountable for the improvement.
Sources
Microsoft Dynamics 365 Blog, “Forrester study finds 346% ROI when modernizing service operations with Dynamics 365 Field Service,” 5 February 2024
Asana Product Updates, “Introducing flexible ways to organize your tasks in list and board views,” 26 February 2024
Join the discussion
Where do misunderstandings most often occur between planning and delivery in your team? Share an example from an assignment.